CROSS RS 4

is an adaptive traffic light controller of the latest generation that meets all the requirements for a modern urban intersection control. CROSS RS 4 is highly reliable, failure-free and easy-to-use.

MAIN ADVANTAGES

  • Fixed signal plan
  • Traffic-dependent control (fixed and flexible stage order and structure, free creation of stages and free creation of signal plan based on the pre-set criteria)
  • So-called „all-red night operation“ – control mode when the signal Free is made only for that signal group where the detector´s request was registered by RS 4P
  • Preference of public transport (active, passive, conditional, absolute)
  • Preference of police, ambulance and fire brigade in 15 pre-set routes
  • Special logical options of programming by means of user´s code (users define traffic behaviour via special functions)
  • Creation of fixed signal plans by means of a standardized description
  • Creation of traffic-dependent control by means of developmental diagrams according to the HBS 2011 norm
  • Meets the requirements of EN 12675 and HD 638 S1/VDE 0832-100

PROGRAMMING OPTIONS

  • CROSS PTC: configuration tool for defining technical and traffic parameters of a traffic light controller
  • LISA+: traffic SW with an option to use pre-defined parameters and logic, generates the definition of a traffic light controller SSZ

CONNECTIVITY TRAFFIC LIGHT CONTROLLER SSZ – TRAFFIC LIGHT CONTROLLER SSZ

  • Standard CROSS interface protocol
  • AZD protocol
  • Parallel collector with defined signals
  • Synchronization based on exact time /GPS/

CONNECTIVITY TRAFFIC LIGHT CONTROLLER SSZ – Urban traffic management centre (TM-Cent)

  • Standard CROSS interface protocol
  • *OCIT® protocol
*OCIT® is a registered trademark of companies Dambach, Siemens, Signalbau Huber, STOYE and Stuhrenberg.